Town Line Road Re-Construction Project

FROM:
Department of Technical Services
Plainville Municipal Center
One Central Square
Plainville, CT 06062
John R. Bossi, Director of Technical Services
Telephone (860) 793-0221, Ext 7171;  Email:  bossi@plainville-ct.gov

December 10, 2020

The Town of Plainville is proposing to reconstruct the pavement on Town Line Road from South Washington Street (AKA CT Route 177), to Red Stone Hill.  The project is currently in the design phase.  The most current construction plans are attached on our website below.  Construction funding for this project will be provided by the Connecticut Department of Transportation under the Local Transportation Capital Improvement Program.

It is the Town’s and State’s policy to keep the public informed and involved when such projects are undertaken.  It is important that the community shares its concerns and comments to assist in the final project development.

The Town of Plainville is proposing to excavate the existing pavement and road base to a depth of seventeen (17”)  inches and install a new twelve (12”) road base and a five (5”) pavement surface.  In addition to the pavement replacement, the Town will be replacing a culvert crossing the roadway in the vicinity of Red Stone Street, (Southington).  The culvert replacement activities will require the closure of the roadway for a period of approximately one (1) month.  Detour signage will be positioned to assist motorist.  Other proposed construction activities will include the installation of curbing, replacement of existing catch basin tops and installation of pavement markings.

A preliminary assessment of the probable construction costs indicates the value of the proposed construction activities to be approximately $1,500,000.  The State of Connecticut will provide 100% of the construction funding.  Construction is anticipated to be initiated in late Spring 2021 with a probable completion date of November 2021.

Anyone interested in obtaining further information or providing input may do so by contacting John R. Bossi, Director of Technical Services at 860-793-0221 Ext 7171 Monday through Wednesday between the hours of 8:00 am and 4:00 pm, Thursday between the hours of 8:00 am and 7:00 pm; Friday between the hours of 8:00 am and 12:00 pm or email bossi@plainville-ct.gov

Plan Attachment at bottom of page.

AttachmentSize
PDF icon town_line_road_plan_sheets_1-8.pdf711.88 KB